Skip to main content

Minimum available charging station also shows incompatible plugs.

My vehicle only jas type-2 chargers and Inset the minimum available stations to 3 but it also calculates in CCS plugs. For example I get led to an EnBW charging park with 20 CCS and 1 type-2 and it happens to be occupied which didn't show on the plug availability. It used to work in previous versions but I think.

Where does this happen?
ABRP version number (found at bottom of settings menu)
Status: Completed4 comments

Log in to comment and vote

Comments4

  • Mahde - ABRP changed status to Awaiting Clarification
    Team•

    Sep 2

    Pinned

    Hello @ABRP User #1191901,

    Can you share a charging station with us through a link that has CCS and Type-2 chargers?

    • ABRP User #1191901

      •

      Sep 2

      An der Breiten Gehre 5, Gardelegen or Benzstraße 6, Wietmarschen for example. I have set my vehicle to only support Level 2. In the planning it defaults to showing me the availability of CCS but there are some Level 2 chargers as well. And when I drive and this becomes my next charging stop the circle which shows the status of all available chargers prefers DC instead of AC. Only works if the charger only has Level 2.

  • Bo (ABRP)

    Team•

    Sep 2

    Thanks - we have fixed this in our codebase and it will be part of the next ABRP release.

    • ABRP User #1191901

      •

      Sep 2

      That was fast! Thank you 😊