Incorrect charging time calculation (Greenway, Powerdot chargers)

🚧 THIS IS A TICKET MIGRATED FROM UPVOTY. The original ticket and comments will be available for a limited time over at:
https://abrp.upvoty.com/b/report-a-bug/incorrect-charging-time-calculation/
β€”β€”β€”β€”β€”β€”β€”β€”β€”β€”β€”β€”β€”β€”β€”β€”β€”β€”β€”β€”β€”β€”β€”β€”β€”β€”β€”
I drive a Tesla Model Y and I'm seeing some weird charging time calculations. They say that charging 53kWh from a 135kW charger would take over an hour even when arriving at low SoC. When I correct the charging power manually to 135kW or even just 65kW as it's a charger that splits the power if 2 EVs are charging it's still significantly faster.
I observe the behaviour with many charging ports from Greenway that are 135kW in ABRP (GW claims 140kW), but it's the same for Powerdot as well so it seems like a kind of a system issue.

Where does this happen?
-
ABRP version number (found at bottom of settings menu)
-

Please authenticate to join the conversation.

Upvoters
Status

Rejected

Board

πŸ› Bug Reports

Date

About 2 years ago

Author

Adam Rynowiecki (Arquiteto)

Subscribe to post

Get notified by email when there are changes.