Gotthard Pass Now Open
The pass has been open since Friday 8th May, and even though I am planning a trip later in May, ABRP won't let me go there, it always takes me through the tunnel despite adding a waypoint on the pass. If I plan for June, it allows me to go there, but then the planning is incorrect due to increased traffic at that time.
- Where does this happen?
- ABRP version number (found at bottom of settings menu)
Log in to comment and vote
Comments9
May 12
PinnedHi,
Please provide a link to the plan where this occurs. To do this;
Plan the trip in ABRP
Click/tap: ‘Share plan’
Click/tap: ‘Share ABRP link’
Paste the URL here
⚠️ IMPORTANT: Please exclude private addresses and the use of ‘my position’, home, work, etc., from the plan you post here publicly.
Paul Adams
May 12
https://abetterrouteplanner.com/?plan_uuid=2-6a02ebd4-e609d37d67a578fbef992710
Paul Adams
May 12
If I change the start date to June then something even stranger happens. It gets to the waypoint on the pass, but then carries on from halfway through the tunnel
Linda ABRP
May 12
On Open street map it’s closed until the last day of May so it will change 1st June in our app.
Paul Adams
May 12
Unfortunately that doesn't help with my journey. I would have thought that you have a good connection with the Open Street Map maintainers/developers and could get them to correct this. This would have been the second time using ABRP for my route planning and battery monitoring since I upgraded to Premium, but now I will have to use Google maps, and lose the connection to, and monitoring of, my car during the drive. This would have been very useful as I am using a car with a very small battery.
Linda ABRP
May 12
It was also closed at Here where we get maps from so I have emailed them to let them know that the pass is open.
Paul Adams
May 12
Thanks very much for your help
Linda ABRP
May 13
It’s changed to open now in Here but you need to set a date for June because there is still parts that is closed in OSM.
Paul Adams
May 13
Thanks 👍