Adding an L2 charger and cannot plan

Creating a plan from Asheville NC to Snowbird Mountain Lodge in Robbinsville, NC plus a round trip to Tellico Plains, TN and back to Snowbird. That worked. But adding the L2 charger that ABRP knows is at Snowbird and now I get an error β€œWe could not calculate your plan”. That would have been a useful change to the plan. Without the L2 charger the plan takes me 23 miles (each way I think - so 46 for R/T) out of the way to a DC Fast Charger, something that accounting for the L2 charger should have made unnecessary. Any ideas how to fix this?

Where does this happen?
Web
ABRP version number (found at bottom of settings menu)
7.1.2 (5875)

Please authenticate to join the conversation.

Upvoters
Status

Awaiting Clarification

Board

πŸ› Bug Reports

Date

22 days ago

Author

David Janson

Subscribe to post

Get notified by email when there are changes.