Red E Birch Run Express Stop Upgrade
🚧 THIS IS A TICKET MIGRATED FROM UPVOTY. The original ticket and comments will be available for a limited time over at:
https://abrp.upvoty.com/b/report-a-charger/birch-run-express-stop-upgrade/
———————————————————————————
Level 2 charger at the Birch Run was upgraded to Red E Stellar 240kW charger.
- What are you reporting?
Log in to comment and vote
Comments4
Katya S.
Nov 25, 2024
Our data provider has updated the location and you should see this reflected in ABRP soon.
Katya S.
Nov 12, 2024
Hi @Zach Schwab,
Do you mean that this location has been replaced with the 240 kW plugs?
https://abetterrouteplanner.com/?charger_id=160628286
Zach Schwab
Nov 12, 2024
1 charge station with 240W shared between 2 CCS1 plugs.
Katya S.
Nov 22, 2024
Thank you, I’ve had this reported to our data provider for this location. I’ve also reported that the operator has changed from ChargePoint to Red E.