When planning longer trips during the summer I often added 10 or 15 minutes to the Charing overhead time to allow for:
*Waiting for an available charger
*Finding the charger (sometimes the route displayed is not available)
*Ramp up time for the charger
*Technical issues to start the charging (network coverage etc)
When planning a full day of driving that includes multiple Charing stops each delay adds up and might lead to a missed deadline.
Now I count the stops and calculate the extra time manually outside ABRP.
It would not be a big thing if I was not used to be able tu use ABRP for this function in the past.
Please authenticate to join the conversation.
Open
π‘ Feature Requests
1 day ago

Erik S
Get notified by email when there are changes.
Open
π‘ Feature Requests
1 day ago

Erik S
Get notified by email when there are changes.